#1
It all starts with a Dream and a Good Plan

#2
Excavation Begins

#3
Concrete footings are installed and protected from frost

#4
Concrete foundation is poured

#5
Forms are stripped and foundation is damproofed

#6
Foundation is backfilled

#7
Egress windows

#8
Floor System is installed

#9
Exterior walls are built and wrapped with air barrier

#10
Interior walls are framed and loft support posts are installed

#11
Kingpost for prow is set

#12
Engineered, energy type trusses and girders installed

#13
Dormers are framed

#14
Prow is being framed

#15
Roof sheathing and roofing felt installed

#16
Roofing completed

#17
Mechanicals are installed

#18
Logs arrive at jobsite

#19
Logs are unloaded, stored and protected from weather

#20
First course of siding with Butt-n-Pass Corners

#21
Logs are expertly installed over air barrier

#22
“Log Style” window and door trim

#23
Prow and covered deck installed

#24
Home is ready for 4-Step staining & sealing process

#25
Special log caulking is installed

#26
Wood and drywall interior finish

#27
Cottage siding installed on exterior walls

#28
Dream Home Complete

#29
Ready for Entertaining

#30
“Sweet Dreams” in your new home